Another road is to shut this week as part of the Douglas Promenade scheme.

Church Road Marina will close to vehicles from Saturday, July 25, reopening on November 10.

Access to Market Street will be maintained along with pedestrian access to the Promenade.

Broadway, Summer Hill and Church Road Marina will be closed at the same time for six weeks.

A new return lane on Loch/Harris Promenade walkway will aid access southbound on Douglas Promenade.

Motorists can access the return lane at the War Memorial and travel back, at no more than 5mph, to the Bottleneck car park exit.

There are also three loading bays to help businesses and residents, along Loch Promenade walkway plus three disabled parking spaces (for two hours) opposite Granville Street.

The monitoring of all temporary traffic measures continues with two new cyclist stop boxes in place at St Ninian’s junction along with a shortened single white line enabling early entry into the left hand turning lane before the St Andrew’s Church entrance.

The bus/cycle lane may be used by Category D or D1 vehicles (minibuses carrying eight or more passengers). Additional buses have been scheduled to help commuters get into Douglas with 12 buses using this lane every hour.

The Department of Infrastructure thanked the travelling public for their patience and understanding.

The temporary traffic measures are to support the lack of traffic flow southbound on Douglas Promenade.

From September 8, two-way traffic flow will be restored from the junction with Broadway north to Summer Hill.

Victoria Street north to Broadway will remain one-way).

From December 15 two-way traffic flows will be restored along the remaining length of the Promenade (Loch Promenade and Harris Promenade).